Transformer oil is not just a coolant; it is part of the insulation, and its condition tells us what is happening inside the tank. Overheating or internal discharge produces gases that dissolve in the oil, and the gas ratios identify the fault type. When the silica gel is saturated or gaskets leak, moisture gets in, breakdown voltage falls and acidity rises.
Our programme combines a field visual check (oil level, silica gel, leaks, Buchholz relay), oil and winding temperature readings with thermal imaging under load, an oil sample sent for laboratory analysis, and tests after isolation and earthing such as turns ratio, insulation resistance and polarization index.
UAE summer heat and industrial-area dust put extra load on naturally cooled (ONAN) transformers, so we pay particular attention to radiator cleanliness and loading after any production-line expansion.
When does a transformer need testing?
Top-oil temperature (OTI) alarm in the afternoon
Overloading after new loads were added, radiators clogged with dust and sand, or both.
Silica gel has turned pink
It no longer dries incoming air, so moisture reaches the oil.
Dark oil in the sight glass or leaking gaskets
Oil ageing or moisture ingress; needs BDV, moisture and acidity tests.
Buchholz alarm after a feeder fault
May indicate internal arcing; do not re-energise before gas analysis and further tests.
New production lines or large loads added
Review loading and winding temperature before insulation enters accelerated ageing.
Annual inspection
Comparing oil results year to year shows the trend before a failure.
Transformer tests we carry out
Visual inspection
Oil level, silica gel and breather, leaks and Buchholz relay.
Temperature, load & thermal imaging
Oil (OTI) and winding (WTI) temperature gauges, load current, and a thermal scan of radiators and terminals.
Dissolved gas analysis (DGA)
Oil sample analysed in the laboratory and interpreted with the Duval triangle to identify thermal or electrical faults.
Oil condition
Breakdown voltage (BDV), water content by Karl Fischer titration, and acidity.
Tests after isolation & earthing
Turns ratio (TTR) per phase, insulation resistance and PI with a 5 kV tester, then a recommendation: clean and manage load, treat the oil, or test further.
References and limits we use
Results are interpreted using IEC and IEEE standards for transformers and insulating oil:
- IEEE C57.104 / IEC 60599
- Dissolved gas interpretation; acetylene at tens of ppm indicates discharge or arcing.
- IEC 60422
- Oil for equipment below 72.5 kV: BDV good above 40 kV, poor below 30 kV; water good below 30 mg/kg; acidity good below 0.10 mgKOH/g.
- IEC 60156
- Method for oil breakdown voltage.
- IEC 60076-1
- Turns ratio deviation ≤ 0.5 % of nameplate.
- IEC 60076-2 / 60076-7
- ONAN temperature-rise limits — top oil 60 K, average winding 65 K — and the loading guide.
- IEEE C57.152
- Polarization index: below 1.1 poor, above 2 good.
What the inspection covers
- Field visual check and thermal imaging under load
- Oil sampling and laboratory dissolved gas analysis
- Oil breakdown voltage, moisture and acidity
- TTR, insulation resistance and 5 kV polarization index
- Written recommendation: radiator cleaning, load management, oil treatment or regeneration, or further tests
- Safe isolation and earthing before electrical tests
Frequently asked questions
What is dissolved gas analysis (DGA) and why does it matter?
Thermal and electrical faults inside a transformer produce gases that dissolve in the oil. A laboratory oil analysis read with the Duval triangle per IEEE C57.104 and IEC 60599 identifies the fault type — such as overheating below 300 °C or arcing — before it leads to failure.
Oil temperature rises every summer — is that normal?
High ambient is a factor, but a recurring alarm is usually overloading or clogged radiators. Start by shedding or shifting peak load and washing the radiators, then study forced cooling if needed.
When should transformer oil be treated or regenerated?
When BDV falls and moisture and acidity exceed the IEC 60422 reference limits. Moisture is removed by heating and vacuum; high acidity may need regeneration, together with new silica gel and leak repair.
Can a transformer be re-energised after a Buchholz alarm?
Not before testing. If DGA shows internal arcing or the turns ratio deviates beyond the limit, the transformer stays isolated and earthed until further tests are done.
Do you serve transformers outside Sharjah?
Yes, we support sites across all UAE emirates; scope and schedule are confirmed for each transformer once rating and location are known.