On-site support means the testing comes to the equipment. We handle power and control circuit faults on production lines, pumps, compressors and fans, and trace them systematically: from the operator’s complaint, to measurements, to the root cause, then the repair and verification.
Our goal is that the fault does not come back. Raising the overload setting when a motor trips may silence the alarm but hides the cause — such as a loose terminal heating up and weakening one phase current. So we measure before we change anything: per-phase current, thermal imaging, insulation and winding resistance.
We serve industrial plants, MEP, maintenance and facilities companies, contractors and workshops in Sharjah and across the UAE, and work alongside our rewinding workshop when a motor has to come off site.
Situations where we work on site
Production line stopped by an electrical fault
Systematic tracing of power and control circuits to find the failed element and restart safely.
Motor trips on overload after a few minutes
Per-phase current and a thermal scan of the terminal box before any setting is raised.
Motor replacement or installation on site
Removal, installation, alignment, connection and commissioning with rotation and current checks.
Burning smell near the terminal box
Usually a loose or damaged lug; cut back the damaged cable and fit a new lug crimped and torqued correctly.
Old starter circuits or repeated panel faults
DOL and star-delta refurbishment and a review of protection coordination.
Need to reduce unplanned stops
A preventive maintenance programme with scheduled checks of critical equipment.
How we work at your site
Request & priority
We record the fault, equipment data and urgency (normal, urgent today, or emergency shutdown).
Arrival & safe isolation
Site assessment and lockout/tagout (LOTO) before working on circuits.
Diagnosis by measurement
Visual check, Megger insulation, winding resistance, per-phase current with a True-RMS clamp meter, thermal imaging and vibration where needed.
Repair or replace
Fix the cause on site, or remove the motor to our workshop for rewinding, with installation and commissioning support afterwards.
Verify & advise
Re-measure in service, reset protection to correct values, and recommend how to prevent a repeat.
References we diagnose against
Site readings are compared with well-known international reference limits so repair decisions are based on numbers:
- IEEE 43
- Motor insulation resistance and polarization index.
- NEMA MG-1
- Phase current unbalance; above about 10 % calls for investigation.
- NETA MTS
- Thermography severity by ΔT between similar components.
- ISO 10816
- Vibration severity for rotating machines.
- IEC 60364-6
- Insulation verification of low-voltage installations.
Industrial support scope
- Fault finding and repair on production lines and machinery
- On-site motor removal, installation, replacement, alignment and commissioning
- DOL and star-delta starter refurbishment and safety checks
- Preventive maintenance programmes and inspection schedules
- Safer, more reliable power and control connections
- Local isolators, glands and protective earthing coordinated with motor installation
Frequently asked questions
Do you respond to plant shutdowns?
You can set the urgency when sending a request (normal, urgent today, or emergency shutdown), or contact us directly by phone or WhatsApp. Availability and timing are confirmed for each call.
Do you cover areas outside Sharjah?
Yes. We are based in Sharjah and support sites in Dubai, Ajman, Umm Al Quwain, Ras Al Khaimah, Fujairah and Abu Dhabi.
The motor trips on overload — should we raise the setting?
Not before diagnosis. Often the windings are fine and a loose terminal is heating and unbalancing the current. After the repair, the overload is set back to the motor’s rated current.
Can you install the motor after a workshop repair?
Yes. We support removal, transport, re-installation, alignment and commissioning on site, with current and rotation checks after start-up.
What does a preventive maintenance programme include?
Scheduled checks of critical equipment — insulation, current, thermal imaging of panels and terminals, and bearing condition — with readings logged so decline is caught before a shutdown.