Motor rewinding workshop • 1Ø & 3Ø

Electric Motor Rewinding & Repair in Sharjah

We rewind and overhaul single and three-phase AC motors — pump, fan, HVAC, gearbox and production-line motors — through a controlled five-stage process that starts with diagnosis and ends with a test run and a technical report.

+971 56 445 8874 · +971 56 668 3688

Rewinding replaces the damaged stator coils with new insulated copper coils built to the motor’s original electrical data, followed by varnish impregnation and thermal curing. Done properly, together with new bearings and a mechanical check, the motor goes back into service with the same mounting dimensions — no changes to the base, flange or coupling on site.

From our Sharjah workshop we serve factories, maintenance and MEP contractors and workshops across the UAE. Scope covers single-phase motors from 0.37 to 5.5 kW, three-phase motors from 0.75 kW up to medium industrial sizes (18.5 – 55 kW); heavy motors of 75 kW and above are scoped after assessment.

Signs your motor needs testing or rewinding

Burnt smell or charred windings

Usually stator insulation failure from thermal overload or phase loss (single-phasing). The fix is normally a full rewind, plus a check of the starter contactor and overload so it does not happen again.

Breaker or RCD trips on start

Possible winding-to-earth fault, inter-turn short or insulation breakdown in the terminal box. We start with a Megger insulation test to locate the fault and define the repair.

Motor hums but will not start

On single-phase motors, often the start capacitor or auxiliary winding; on three-phase motors, a lost supply phase or a seized bearing. We check free shaft rotation and winding continuity first.

Frame running very hot

Damaged fan or blocked fins, voltage unbalance, mechanical drag or ageing insulation. We inspect cooling, measure no-load current and decide whether cleaning and varnish are enough.

Water ingress / low insulation

Moisture pulls insulation resistance below the safe limit. Many cases recover with cleaning, controlled baking and varnish — without a rewind — if Megger readings return to normal.

Grinding noise or shaft vibration

A sign of worn bearings. Stop the motor to protect the windings from rotor-to-stator rub, then replace drive-end and non-drive-end bearings and check the shaft fit.

How we rewind a motor: five documented stages

  1. Receive & inspect

    Record nameplate data; inspect housing, shaft, fan cowl and terminal box.

  2. Diagnose

    500 V / 1000 V Megger insulation-to-earth test, coil continuity and short analysis, bearing and housing wear check to find the root cause.

  3. Repair / rewind

    Safe coil stripping, thermal slot insulation, copper rewinding to original data, varnish curing and new bearings.

  4. Test

    Repeat Megger and phase-resistance balance checks, assemble, then a no-load bench run to verify current, temperature and balance.

  5. Report & deliver

    Final safety and quality sign-off, test summary with readings, and handover.

Reference standards we measure against

Test readings are compared with reference limits from widely used international standards for electric motors:

IEEE 43
Insulation resistance and polarization index; for low-voltage windings a minimum of 5 MΩ and PI ≥ 2.0.
IEC 60034
International series for rotating electrical machines.
NEMA MG-1
Reference for current unbalance — above about 10 % calls for investigation.
ISO 10816
Vibration severity in mm/s RMS for machines of roughly 15–75 kW.

What the service includes

  • Stator rewinding for single and three-phase motors with high-temperature insulated copper
  • Approved slot insulation, insulating varnish and thermal curing
  • Drive-end and non-drive-end bearing and seal replacement; shaft, rotor and fan checks
  • Fan cowl and terminal box refurbishment
  • HVAC, chiller pump, fan and gearbox motors
  • A tracking code for every motor to follow the stage and test readings online

Frequently asked questions

When is rewinding better than buying a new motor?

For industrial, pump and HVAC motors — especially 3 kW and above or with custom flanges and shafts — a controlled rewind with new bearings restores dependable performance, saves 45–65 % of the cost and keeps the exact mounting. The final call depends on the diagnosis and the condition of the frame and shaft.

Do you test the motor before handover?

Yes. Testing is mandatory: 500 V/1000 V Megger insulation resistance, phase winding balance, a mechanical check and a no-load run verifying current and temperature.

How do I follow my motor’s progress?

Each motor gets a tracking code (e.g. ATM-MTR-XXXX). Enter it in the tracker on our website to see the current stage (1 to 5) and the workshop’s Megger and no-load readings.

Which motor sizes do you rewind?

Single-phase 0.37–5.5 kW and three-phase from 0.75 kW up to 55 kW; motors of 75 kW and above are scoped after assessment. Capacity and timeline are confirmed in writing for each job before work starts.

Can a water-damaged motor be saved without rewinding?

Often, yes: cleaning, controlled thermal drying, anti-moisture varnish, new seals and bearings, then a Megger re-test. If insulation does not return within reference limits, rewinding is the safe option.