We service and refurbish main and sub distribution boards (MDB / SMDB / DB), control panels and motor control centres (MCC), including DOL and star-delta starter circuits, and coordinate protection breakers, contactors and relays.
We measure before we replace. A breaker that trips at peak load is not necessarily faulty — the terminal on it may be loose and overheating. A neutral that runs hot with balanced loads may be carrying third harmonics from computers, LED lighting and UPS units. So we combine thermal imaging under load, phase/neutral current and harmonic measurement, and torque and insulation checks after safe isolation.
Signs your panel needs inspection
Hot-insulation smell or a warm spot on the door
Usually a loose connection heating under load; thermal imaging pinpoints it.
Breaker trips at peak load
The breaker may be healthy and the cause a loose lug or overload; we measure load and test the trip curve before replacing anything.
Neutral or neutral bar overheating with balanced loads
A sign of third harmonics from electronic loads; needs a power-quality check and may require a larger neutral or a harmonic filter.
Random RCD trips and crackling in humid weather
Common in older seaside panels; points to weak insulation or tracked insulators.
Browning or carbon marks on terminals and insulators
Thermal damage that must be fixed before it becomes an arc.
New loads added without reviewing the board
Expansions change load distribution; a full check avoids surprises.
How we inspect and service a panel
Visual check & panel meters
External inspection and voltage/current meter readings without opening covers.
Thermal scan under load
Thermal imaging with the door open during operation, wearing arc-flash PPE.
Load & harmonic measurement
Phase, neutral and harmonic currents with a True-RMS power-quality analyser.
Checks after safe isolation (LOTO)
Connection torque with a calibrated torque wrench, busbar insulation with a 500 V Megger, breaker trip test by secondary injection.
Repair & re-measure
Replace damaged lugs or insulators, torque to manufacturer values, clean, then re-measure in service to confirm the cause is gone.
Reference standards
Results are assessed against reference limits from international standards for low-voltage panels and installations:
- NETA MTS
- ΔT between similar components: 1–3 °C watch, 4–15 °C repair soon, > 15 °C repair immediately.
- IEC 61439
- Low-voltage switchgear and controlgear assemblies.
- IEC 60364-6
- Verification of installations up to 500 V: insulation test at 500 V DC, minimum 1 MΩ.
- IEC 60364-5-52
- Max conductor temperature 70 °C for PVC and 90 °C for XLPE; neutral sized by its current when third harmonics exceed 33 %.
- IEC 60947-2 / IEC 61008
- MCCB trip curves; RCD trip band 50–100 % of rated residual current.
- IEC 61000-2-2 / EN 50160
- Voltage THD planning level up to 8 %.
Service scope
- DOL and star-delta starter panel inspection and refurbishment
- Protection breaker, contactor and relay coordination
- Thermal imaging, load and harmonic surveys
- Connection torque, busbar insulation and breaker trip tests
- Diagnostic instruments and electrical safety PPE
- Technical support for MEP and maintenance projects
Frequently asked questions
Why does the main breaker trip only around midday?
Often the load is within rating and the breaker is fine, but a terminal is loose and overheats at peak load and ambient temperature. Thermal imaging, torque checks and a trip-curve test find the cause before any part is replaced.
Can thermal imaging be done without shutting down?
Yes — thermography is done in service under load, which is the best time to find hot spots. Torque, insulation and breaker tests need a planned shutdown with LOTO.
The neutral runs hot although phases are balanced — why?
With electronic loads (computers, LED lighting, UPS) third harmonics add up in the neutral, whose current can exceed the phase current. The fix follows a power-quality measurement and may include a neutral of 1.7–2× phase size, 4-pole breakers or an active harmonic filter.
Do you refurbish old star-delta panels?
Yes. We inspect and refurbish DOL and star-delta starters and review breaker, contactor and overload coordination to stop repeat failures.
Can you supply panel parts?
Yes. As part of project support we source protection and control components, instruments and safety equipment matched to the required specification; availability is confirmed per request.